• Reactive quality management drains capacity and margin. Inspection and rework consume labour, disrupt flow, and hide real problems.
  • First-pass yield (FPY) is a capacity lever. Higher FPY unlocks throughput, stabilises delivery, and cuts cost without new investment.
  • Build quality at the source. Lean discipline and execution, not more inspection, prevent defects and drive performance.