Is your EBITDA coming from demand you can prove? A buyer will only believe it if they can trace it. A private equity operational due diligence team tests two things: whether the growth is in the forecast, and whether the plant has the capacity to deliver it. An uncertain answer on either puts a discount on the EBITDA story, which is why the strongest vendor due diligence is built long before the sale process begins, through forecasting and S&OP running inside the value creation plan.
Vendor due diligence, known in the US as sell-side due diligence, is the review a seller commissions before a sale so that bidders see an independent view of the business. For a manufacturer, the operational part of that review comes down to one question: can the forecast and the plant support the EBITDA in the plan?
Buyers are not getting easier to convince. Simon-Kucher’s 2026 Private Equity Value Creation Study, run with PEI across 215 respondents, found that 66% believe diligence over-indexes on assessing opportunity rather than execution readiness, and its authors argue that value creation has to be demonstrated as well as delivered. Advisory firm CLA notes that leading firms prepare for exit 12 to 18 months in advance, because EBITDA adjustments are challenged and forecasts must align with operational realities. That 12 to 18 month window is the final stage, and the record a buyer wants to see is built during the hold.
The failure buyers screen for
We see one pattern more than any other: strong demand, a good product and a plant that cannot ramp up. Planning, supply chain and capacity were never lined up with demand, and it breaks both ways. Some manufacturers under-forecast, so the demand arrives and the capacity is not there to fill it. Others over-forecast and burn capacity building product nobody needed yet. Either way the EBITDA forecast misses, which is why a buyer’s test of whether your number will hold starts with the demand forecast. A diligence team walks the chain in three steps.
Step 1: Start with the customer
They start where the money starts: who is ordering, how often, and what customers expect on delivery and quality. They look at the order book, order history, customer concentration and on-time-in-full performance. Growth that rests on one customer, or on delivery performance the plant does not achieve today, is growth at risk, so customer-level data showing where growth comes from, and whether it lasts, carries real weight.
Step 2: Forecasting accuracy and the S&OP process
S&OP is a value creation lever before it becomes a diligence exhibit. Demand forecasting in manufacturing usually breaks in two places: how accuracy is measured, and how the forecast meets the budget.
How forecasting accuracy is measured
The first number we ask for is forecast accuracy, and how it is measured matters more than the number itself. Many companies measure against last month’s forecast, and because they can already see the month’s orders by then, they look accurate. Measure against the forecast made when materials had to be committed, often three months earlier, and the picture changes. At one growing manufacturer, we ended up measuring at a two to three month lag, because that is when materials, equipment and people have to be committed.
When the forecast meets the budget
Then comes the budget. A diligence team looks for a forecast that keeps moving while the annual number never does. Say a team misses January by €1 million, spreads the shortfall across the rest of the year and holds the budget, and then does the same in February. The second half keeps growing with no plan behind it. That is the hockey stick, and it ends in November with too much inventory, wasted capital, and time and people spent on product nobody needed.
S&OP breaks the cycle by keeping the demand plan separate from the budget. Sales says what it expects over the next 12 months, and you set that against the budget. The gap forces the real conversation about which customers, which markets and what help is needed. At one building products manufacturer, sales over-forecast by about 10% every month. Leadership wanted sales held to the number, so we planned materials about 10% lower, closer to reality.
The payoff reaches the cost structure, because S&OP shows where demand is heading so staffing and spend can adjust before a miss. At a North American food packaging manufacturer, supply chain redesign improved forecast accuracy from 55% to 75%, cut inventory by $1M and raised fill rates from 97.7% to 98.5%. In our experience, product-family forecast accuracy at manufacturers commonly sits between 55% and 70% before this work.
Step 3: Capacity and line balance
Last, they test whether the plant can make what the forecast promises. They compare actual run rates with the theoretical maximum, find the bottleneck, and check whether sales, supply chain and operations forecasts drive capacity decisions. In one TBM diligence case, recalculating capacity showed key coaters running at under 25% of available hours, which exposed idle capacity and narrowed the capital expenditure request to a few targeted items.
For capital-heavy plants, we start with OEE and uptime: set-up times, maintenance and quality downtime. Lines that are out of balance mean the real constraint may not be where the plan assumes, and connected data matters too. One global manufacturer absorbed more than $2 million in expedited air freight after capacity issues went undetected. A monthly S&OP cycle built on live operational data has since helped it avoid over $1M in potential freight costs.
What to build during the hold, before vendor due diligence starts
Put each item in the value creation plan with a time to EBITDA. Start with forecast accuracy history, because a year of locked forecasts cannot be created after the process starts. Build three things, in this order:
- Forecast accuracy history. A year or more of locked monthly forecasts measured against actuals at the right lag, with bias tracked by product family. Our guide to using S&OP outputs to stress test revenue assumptions shows how to put that history to work.
- A documented S&OP cadence. A monthly cycle with pre-reconciled demand, supply and finance views, an executive session that makes decisions, and a closed loop to production and purchasing, so that S&OP works as a strategy execution engine.
- Capacity tied to the forecast. A constraint map by line, and a capacity plan that updates when the forecast does.
If the clock is already running, move on the quickest returns first. My recommended 90-day value creation list is short: rebid purchased materials, right-size the cost structure to the forecast, and push the constrained work centre that has an order book. The 12-month work is lean across the work cells. Sponsors know how to find revenue, and the question a buyer asks is whether operations can deliver it.
If the original value creation plan has run its course, write the second one around these three items. If a sale process is 12 to 24 months away, start with Phase Zero, the diagnostic that finds which lever matters and sizes it in weeks.